Project Summary
This project included communication, water, natural gas, and sewer utility upgrades. Only the communication duct bank system was performed by Gardner Zemke forces. This system consists of 14,000 linear feet of 5” duct bank (175,000’ of pipe total). The duct bank varies from 6’ to 16’ deep, and a large percentage of the duct bank was prefabbed at our own facility. There were a total of 51 manholes installed, some of which were 20’ deep.
Fort Bliss Army Base – El Paso, Texas
Durango, Colorado
White Sands Missile Range – New Mexico
Fort Bliss Army Base – El Paso, Texas
Grand Coulee Third Power Plant – Grand Coulee, WA
Grand Coulee, Washington
Fort Bliss Army Base – El Paso, Texas
Sandia National Laboratory – Albuquerque, New Mexico
Eunice, NM
Los Alamos National Laboratory – Los Alamos, NM
Los Alamos National Laboratory – Los Alamos, NM
Fort Bliss Army Base – El Paso, Texas
Lordsburg Subdivision – Strauss, NM
Kirtland Air Force Base – Albuquerque, New Mexico