The Mechanical System in this 100,000 SF computer and engineering laboratory included two 400 ton chillers, two cooling towers, two boilers, 135 fan powered air terminals, five air handling units, and six batteries of bathrooms.
Two modular wiring systems were installed under the raised floor, one for power to work stations and one for HVAC VAVs. Special systems included fire alarm, access control, intrusion alarm, packaged dimming systems, and motion lighting control.
The site utilities portion of the project included the installation of Owner furnished 15kV switchgear, pad mounted transformers, two-way 5”, eight-way 5”, five-way 4” duct banks, site lighting conduit, new manholes, poured in place pole bases, and pole lights. Installation of these systems included scheduling outages so we could tie in to existing manholes.
Fort Bliss Army Base – El Paso, Texas
Durango, Colorado
Sandia National Laboratory – Albuquerque, New Mexico
White Sands Missile Range – New Mexico
Fort Bliss Army Base – El Paso, Texas
Grand Coulee Third Power Plant – Grand Coulee, WA
Grand Coulee, Washington
Fort Bliss Army Base – El Paso, Texas
Eunice, NM
Los Alamos National Laboratory – Los Alamos, NM
Los Alamos National Laboratory – Los Alamos, NM
Fort Bliss Army Base – El Paso, Texas
Lordsburg Subdivision – Strauss, NM
Kirtland Air Force Base – Albuquerque, New Mexico