Project Summary
The scope of work for the substation portion of this design-build project included the demarcation of 13.8kV feeder circuits at the13.8kV cable terminator support structure located within the NEF 115-13.8kV transformer facility, termination from the 13.8kV cable terminator onto the visible blade disconnect switches, demarcation for control/instrumentation cable from/to the NEF Plant, and demarcation for control/instrumentation cable from/to host facility.
The owner added additional work to this project which included the construction of a large cable pit vault where the future CUB building will be located.
Fort Bliss Army Base – El Paso, Texas
Durango, Colorado
Sandia National Laboratory – Albuquerque, New Mexico
White Sands Missile Range – New Mexico
Fort Bliss Army Base – El Paso, Texas
Grand Coulee Third Power Plant – Grand Coulee, WA
Grand Coulee, Washington
Fort Bliss Army Base – El Paso, Texas
Sandia National Laboratory – Albuquerque, New Mexico
Los Alamos National Laboratory – Los Alamos, NM
Los Alamos National Laboratory – Los Alamos, NM
Fort Bliss Army Base – El Paso, Texas
Lordsburg Subdivision – Strauss, NM
Kirtland Air Force Base – Albuquerque, New Mexico