Gardner Zemke Company electrical team provided and installed the building electrical infrastructure to include: 15KV underground utility service system, 400kW engine generator and associated transfer switches, interior power distribution system, interior and exterior lighting system, grounding system, lightning protection system, addressable fire alarm system, security and access control system rough-in, equipment start-up, and applicable system testing.
Gardner Zemke Company Mechanical provided and installed complete HVAC and plumbing in the new WIF building as well as upgrade and addition of equipment to the existing central utilities building and ductwork for: two 650 ton cooled chillers, two cooling towers, two 8,370 MBH boilers, three make up air laboratory air handling units approximately 20,000 CFM, three office air handling units approximately 35,000 to 43,000 CFM each, and two roof top air handling units approximately 18,000 CFM each, 21 pumps, and 318 VAV air terminal units.
Fort Bliss Army Base – El Paso, Texas
Durango, Colorado
Sandia National Laboratory – Albuquerque, New Mexico
White Sands Missile Range – New Mexico
Fort Bliss Army Base – El Paso, Texas
Grand Coulee Third Power Plant – Grand Coulee, WA
Grand Coulee, Washington
Fort Bliss Army Base – El Paso, Texas
Sandia National Laboratory – Albuquerque, New Mexico
Eunice, NM
Los Alamos National Laboratory – Los Alamos, NM
Los Alamos National Laboratory – Los Alamos, NM
Fort Bliss Army Base – El Paso, Texas
Lordsburg Subdivision – Strauss, NM